Emley Moor transmitting station
Emley Moor transmitting station, officially known as The Arqiva Tower, is a telecommunications and broadcasting facility on Emley Moor, in Kirklees, West Yorkshire.
With a height of 330.4 m (1,084 ft), it is the tallest freestanding structure in the UK, the seventh tallest in the European Union, and the 24th tallest tower in the world. It is 20.8 m taller than The Shard, which is popularly thought to be the tallest structure in the UK.
Designed by Arup, the structure consists of a tapered cylindrical pillar of reinforced concrete, topped by a steel lattice mast carrying 55 m (180 ft) tall antennas.
The current tower is the third such structure to have occupied the site. The original lattice tower was built in 1956 and measured 135 m (443 ft) tall. It was used to broadcast ITV to the Yorkshire area. In 1964, it was replaced by a guyed mast measuring 385.5 m (1,265 ft).
In March 1969, the structure collapsed as a result of strong winds and the weight of ice that had formed around the top of the mast and on the guy wires. The subsequent committee of inquiry blamed the collapse on a form of oscillation which occurred at a low but steady wind speed.
The construction of the current tower was begun in 1969 and was completed in 1971. It is built on foundations which extend 6 m (20 ft) into the ground. A control room at 274 m (900 ft) can be reached by a lift that takes around 7 minutes to ascend.
In 2002, English Heritage (now Historic England) granted the tower Grade II listed building status due to its ‘significant architectural or historic interest’.
In recent years, the tower has had supporting structures attached to accommodate more dishes and aerials, reflecting the changing nature of communications and technology.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).